Truss Delivery and Installation
July 14th, 2016
The old trusses in the kitchen (left photo) have been removed and the new ones have been delivered and installed (right photo).
Skylight and Roof Installation
June 7th, 2016
The installation of the new skylights and roof have been completed.
Skylight, Coping Stone, and Roof Replacement
May 9th, 2016
New skylight frames have been installed on the roof. Large flat roof replacement and coping stone installation above the Great Hall are in progress.
Channel Support and Copper Wall Flashing
January 19th, 2016
Steel channel support for skylight has been installed. Copper wall flashing above skylight in progress.
Roof Shed and Slate Roof
January 4th, 2016
Slate roof is 95% complete. Removal of existing shed is complete and framing work for new skylights is in progress.
Roof Shed and Slate Roof
November 15th, 2015
Framing for temporary roof shed and slate roof replacement above kitchen in progress.
Ceiling and Steel Support
November 10th, 2015
Ceiling protection installed in great hall for roof replacement. New steel supports installed for existing A/C condensors
Excavation and Electrical Work
November 3rd, 2015
Excavation for new drainage gravel at rear foundation wall and relocation of kitchen electric panel in progress.
Plumbing
September 11th, 2015
The plumbing repair work is in progress for the sanitary lines in the basement.
The old pipes were heavily clogged with debris and extensive blockage reduced their flow and capacity, as can be seen in the photos below.